A SEPCO new connection request needs a clear description of what you want connected. A newly built house, an additional portion of an existing building and a shop within shared premises should not be described as though they are identical situations.
Before paying anything, confirm the serving office and application route through SEPCO or its customer-service office. Public website access was intermittent during preparation, so this guide avoids claiming that a particular online form was successfully tested.

Explain your SEPCO new connection request
Write down the applicant, complete premises address, intended use and whether another electricity connection already exists at the property. These notes help you ask the right questions when obtaining the current form.
If you want a separate meter for a portion of a building, describe how that portion is identified and used. Ask the company what it needs to assess the request. Do not assume every family arrangement automatically qualifies for another connection, or that an existing meter must be removed.
Eligibility and technical decisions belong to the company under the applicable requirements. This article helps prepare the facts; it does not approve a second meter.
Make the documents tell the same story
Use the checklist supplied with the current application. Check that the applicant details and premises description match across the form and attachments. For a rented or jointly held property, ask which permissions and supporting documents are needed.
If the address is described differently in an older document, raise that difference before submission. Do not edit an official document yourself to make it appear consistent. Ask what explanatory or corrected record is acceptable.
Keep a private copy of everything submitted. Use clear filenames so you can locate the requested page if the application office asks a question later.

Discuss load and site access before the notice
Prepare an equipment list and explain whether the premises will be used as a home, business or another category of supply. A qualified electrician can help you understand the installation requirements, while the company must confirm the appropriate connection assessment.
Explain how the premises can be accessed for any required visit. If the property is locked most days, provide an authorized contact who can arrange access. Do not leave an applicant's private documents with an unrelated neighbour unless the official process requires an authorized representative.
Keep payment tied to the application
Save the acknowledgment and any case number. When a notice is issued, compare the applicant, location and requested supply with your own submitted record. Check the amount and authorized payment instructions on the actual notice.
Do not pay a figure copied from another applicant's screenshot. Ask what the notice covers, particularly when an estimate includes work or material you do not understand. Consult the current regulatory background through NEPRA's manual index where needed.
Keep the payment receipt and any submission acknowledgment separately from the notice. If the application remains pending, ask which stage is incomplete and what action is needed from you. That is more useful than repeatedly asking whether the meter will arrive “soon.”
Frequently asked questions
Can another family member apply for a separate portion?
Describe the actual ownership and use arrangement to SEPCO and ask what requirements apply. Do not treat a general blog as confirmation of eligibility.
Is a demand notice the same as an installed connection?
No. Keep application, payment and installation confirmations as separate records.
What if I cannot find the application online?
Contact the office with the existing acknowledgment. Ask how to continue or recover the case before submitting another application.
Where should the payment go?
Follow the official notice and authorized payment instructions. Avoid personal-account transfers offered as a shortcut.
For the wider process, read the new-connection preparation guide. After billing begins, use the SEPCO bill guide and save the first bill.
Editorial Note and Background
Prepared 26 September 2026; publication copy reviewed 29 September 2026. Independent, AI-assisted guidance, not an official company service or a report of a personally completed application. Examples are illustrative. Confirm current account-specific instructions with the company using the contact details on your bill.
Public source domains consulted during preparation: nepra.org.pk, sepco.com.pk. Portal access limitations are identified in the article where relevant.
For background reading only: Pakistan's electricity sector on Wikipedia. Wikipedia is not the authority for your application, complaint, payment or current service instructions.
Contact BijliBills about a correction or read our editorial guidelines.