Before applying for a HESCO new connection, settle three practical questions: who is the applicant, which premises needs supply, and what electricity use is planned there. Those details should agree across the form, supporting documents and any later demand notice.
Use HESCO's official website or its customer-service office to confirm the current application route. The website was not consistently reachable during this article's preparation, so the steps below are a document-preparation guide, not a claim that an online application was tested successfully.

Prepare for a HESCO new connection application
Ask for the current form and attachment checklist. The older manual available on HESCO's site is background material; consult NEPRA's manual index for later revisions. Do not assume an old PDF settles every current document or procedural requirement.
Read the checklist before arranging scans or photocopies. Check whether each requested page is legible and whether the name, identity details and premises address match. An unclear attachment can be harder to correct after the applicant has left the service office.
When the premises is rented or shared
Explain who owns the property, who will use the supply and who is applying. Ask what permission or authorization HESCO requires for that arrangement. Do not assume that being the person who usually pays the rent automatically makes you the correct named applicant.
For a shared building, identify the exact portion or unit. Keep the description consistent: “upper portion” on one document and a different unit number on another may need clarification. If an existing connection serves the building, tell the company and ask how the proposed separate supply should be assessed.
This is not a ruling on eligibility for multiple meters. The company must review the actual premises and relevant requirements.

Explain the intended use accurately
A home, a shop and a premises operating machinery may need different assessments. Prepare an equipment list and discuss the suitable load and wiring requirements with a qualified electrician and HESCO.
Do not guess a smaller figure to chase a lower quotation. Equally, do not choose an oversized load merely because someone online called it “future proof.” Explain the expected use and ask for the appropriate assessment.
If the property is still being built, say so before applying. Ask whether construction use changes the type of request needed rather than assuming the permanent supply process covers every stage.
Keep the submission easy to follow
Retain the submitted form, acknowledgment and application identifier. When more information is requested, note what was requested and when you supplied it. Keep subsequent documents attached to the same case record.
Before paying a demand notice, check that it names the correct applicant and premises. Review the amount, deadline and authorized payment method. Keep the notice and receipt as separate files, then follow the company's instructions for confirming the payment.
Do not pay an unofficial “processing charge” to a personal account on the promise of a guaranteed installation date. Ask for an official explanation and receipt for payments requested through the application process.
Frequently asked questions
Can a tenant start the application?
Ask HESCO what applicant and owner authorization is required for the premises. Do not assume a universal answer applies to every tenancy.
What if the address on a document differs slightly?
Raise the discrepancy before submission and ask what correction or explanation is needed. Do not silently edit an official document.
Can I track using a monthly bill number?
Use the case identifier issued for the new application. Keep it separate from any existing account reference.
When should I ask about the fee?
Ask about the official estimate and notice for your actual application. A price without the load and installation details is not enough to plan around.
Our demand-notice guide covers document handling. Once bills begin, use the HESCO bill guide and retain the first issued record.
Editorial Note and Background
Prepared 26 September 2026; publication copy reviewed 29 September 2026. Independent, AI-assisted guidance, not an official company service or a report of a personally completed application. Examples are illustrative. Confirm current account-specific instructions with the company using the contact details on your bill.
Public source domains consulted during preparation: hesco.gov.pk, nepra.org.pk. Portal access limitations are identified in the article where relevant.
For background reading only: Pakistan's electricity sector on Wikipedia. Wikipedia is not the authority for your application, complaint, payment or current service instructions.
Contact BijliBills about a correction or read our editorial guidelines.