A separate electricity meter for a rented portion requires the supplier to approve a separate connection for that premises. Begin with the property’s layout, the existing connection details and the owner’s consent. Renting one room or paying part of a shared bill does not, by itself, establish eligibility.
Before paying charges or arranging work, ask your electricity company which separate-portion rules apply. Agree with the landlord who will apply, supply the documents and pay the official charges. Keep that discussion separate from any private arrangement for dividing the current bill.

Decide which request you need
Explain the outcome you want rather than asking for a “new meter” without context. That phrase can describe several different jobs.
| Your situation | Request to discuss with the supplier |
|---|---|
| A separately occupied portion needs its own supplier bill | An additional residential connection, subject to the premises rules |
| The existing account needs a different consumer name | A name change and the relevant supporting evidence |
| The existing supply needs more capacity | A sanctioned-load review or extension |
| The landlord wants to measure usage within one account | Clarify the private submeter arrangement and the supplier’s applicable conditions |
A private submeter records usage within an arrangement; it does not itself create a new DISCO consumer account. Ask who receives the supplier’s bill and how shared appliances and common-area use are handled.
If the supply is staying the same and only the name needs updating, use the electricity bill name-change guide. For more capacity, see sanctioned-load extension.
Check the rules for separate residential portions
Section 2.8.2(a) of the Consumer Service Manual hosted by IESCO, updated through 26 November 2025, lists separate portions, electric circuits, kitchens and entrance/access, plus an affidavit about a separate family occupying the portion. Ask the company to assess the actual layout against the applicable requirements.
Section 2.8.2(b) describes a separate time-of-use connection route at 5 kW and above where separate circuits exist, with a restriction on later load reduction to preserve that tariff’s applicability. It should not be treated as an automatic shortcut. Ask for the tariff and continuing conditions in writing before choosing it.
Describe shared features honestly. A common water pump, staircase lighting or access route may need clarification. Do not invent separate facilities or sign a statement that does not match the property.
Have a qualified professional assess internal wiring where needed. A room-by-room sketch can help explain occupancy, but it is not an electrical design. Leave meter connections, seals and supply equipment to the authorized team.
Get the tenant and owner documents straight
Ask for a checklist specifically for a tenant applying for an additional connection. The same manual’s sections 2.3.1 to 2.3.4 cover ownership evidence, affidavits, owner consent and identity documents. A tenancy agreement alone should not be assumed to satisfy the entire application.
Prepare the file with clear responsibilities:
- The applicant checks the name, contact details, requested load and exact portion address on the form.
- The owner supplies the ownership evidence and the required no-objection or consent documents.
- Both parties review any undertaking about unpaid electricity dues before signing.
- The person submitting the file checks the company’s requirements for CNIC copies, witnesses, attestation and originals.
The owner undertaking described in section 2.3.3 includes responsibility for a tenant’s default amount. Read the current form carefully; do not treat it as a routine signature with no financial consequence.
List existing connections at the property. If a standard affidavit says no connection previously existed but the house already has one, ask the office for the correct wording for an additional portion. Do not sign an inaccurate declaration just to complete an upload.
Submit identity and property records through a verified official channel. Keep copies private and avoid posting CNIC images or complete bills in public comments.

Confirm site requirements and official charges
Start from the supplier’s official website or customer-service office. Our new-connection application guide explains the general preparation, but follow the route assigned to your company and area.
Ask what inspection, load assessment and meter-location requirements remain before approval. Do not arrange alterations merely because another tenant obtained a meter in a different building. The company must assess your premises.
For new electricity connection charges, obtain the official demand notice and its breakdown. Confirm which costs relate to the connection, security deposit or additional work, and who has agreed to pay them. A neighbour’s total is not a quote for your portion.
Pair the notice with its receipt using the demand-notice checklist. If the application is refused or work changes, request the written reason and applicable payment treatment rather than assuming an automatic refund.
Check the approval and first account record
Retain the approval, application reference and installation record. When the first bill becomes available, compare the consumer name, portion address, meter number, sanctioned load and tariff with the approved request.
Resolve any remaining shared-use arrangement with the landlord, particularly if common equipment is still served through one account. Keep that agreement clear so a new bill does not leave the old cost-sharing question unanswered.
If a tenancy or ownership dispute arises, seek appropriate professional advice. An electricity account is not a substitute for resolving property rights.
Frequently asked questions
Can a tenant apply in their own name?
Ask the supplier for its tenant-application route and owner-consent requirements. Tenancy does not remove the premises and document checks.
Does the portion need a separate kitchen?
The cited residential-portion provision includes one. A separate time-of-use provision has different conditions, so ask which route applies.
Does a landlord’s submeter give me a separate supplier bill?
No. A separate supplier account needs the company’s approval and account setup.
Will a second meter guarantee a lower combined bill?
No. Eligibility, approved tariff and applicable charges must be considered. Do not apply using false occupancy or layout details.
What if the landlord will not provide consent?
Explain the situation to the supplier and ask what lawful route is available. Do not imitate a signature or submit consent on the owner’s behalf.
Editorial note and sources
Prepared and reviewed 1 October 2026. Independent, AI-assisted guidance, not an official application service, property-law opinion or approval guarantee. Examples are illustrative.
Primary references: Consumer Service Manual, November 2025 edition, sections 2.3 and 2.8.2 and NEPRA’s legal documents index. Confirm later amendments and the current supplier checklist before signing or paying.